1. Basic Details

  • Department: Hyderabad Metropolitan Water Supply & Sewerage Board (HMWS&SB)
  • Tender Notice No.: EP-32/CGM(E)/Serilingampally Zone/2026-27
  • Tender ID: 698902
  • Date (Tender Notification): 05.05.2026
  • Type of Tender: Open (NCB)
  • Category: Works
  • Tender Evaluation: Percentage Basis

2. Tender Information

Reservation: This work is earmarked for Scheduled Castes contractors as per G.O.Ms. No. 59, dated 21.05.2018.


3. Estimated Contract Value

  • Total Value: ₹1,75,528/- (Rupees One Lakh Seventy-Five Thousand Five Hundred Twenty-Eight Only)

4. Important Dates

  • Tender Opening Date: 05.05.2026
  • Bid Submission Closing Date: 08.05.2026 up to 04:45 PM

5. Scope of Work

The scope of work includes execution of DI pipeline works and associated civil activities as per HMWS&SB specifications:

  • Excavation of pipeline trenches in all types of soils
  • Laying and jointing of 150mm dia DI K7 pipelines
  • Lowering of pipes and specials into trenches
  • Construction and fixing of RCC precast manhole chambers
  • Jointing of DI/CI pipes with D/F and Tyton joints
  • Cutting of existing DI/CI pipelines
  • Road cutting of CC surfaces
  • Dummy arrangements for pipeline connections
  • Conveyance of pipes and materials to site
  • Testing and commissioning of pipeline

6. Bill of Quantities (Summary)

Sl. NoDescription of ItemAmount (INR)
1Earthwork Excavation61,035
2Road Cutting (CC Road)56,405
3Pipe Laying & Jointing34,754
4Manhole & Dummy Works12,861
5Conveyance8,651
Total₹1,75,528

7. Technical Requirements

  • All materials shall conform to HMWS&SB and IS standards
  • Proper alignment and gradient shall be maintained
  • Jointing shall be leak-proof and tested under pressure
  • Safety measures must be followed during execution
  • Existing utilities shall be protected during execution

8. General Conditions

  • Contractor shall arrange all labour, machinery, tools, and equipment
  • Site shall be cleared after completion of work
  • Payment shall be based on recorded measurements
  • Work shall be completed within stipulated time

9. Special Instructions

  • Traffic management shall be ensured during road cutting works
  • Proper finishing and restoration of CC roads is mandatory
  • Pipeline testing shall be conducted before commissioning

📞 Contractor Contact Information

For execution of similar works including JCB excavation, DI pipeline laying, trenching, road cutting, and demolition services, contact:

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post