Category: Hyderabad Metropolitan Water Supply and Sewerage Board / Major Water Transmission Infrastructure Works
๐ Tender Overview
The Hyderabad Metropolitan Water Supply and Sewerage Board has invited open tenders for shifting the existing Ring Main-I 1800mm dia MS water supply transmission main at Ayodhya Nagar, Gundlapochampally to facilitate the construction of a Railway Over Bridge (ROB) at LC 246A.
The project involves manufacturing, supply, delivery, lowering, laying, welding, testing and commissioning of large-diameter MS transmission pipelines, trenchless crossing works, excavation in hard rock, thrust blocks, valve chambers, air valve installations, and associated transmission infrastructure works.
This is a major bulk water transmission project aimed at protecting and relocating critical water supply infrastructure while enabling railway overbridge construction.
๐ Basic Tender Details
| Particulars | Details |
|---|---|
| Tender ID | 704795 |
| Tender Notice No. | EP.No.17/2nd call/CGM(E)/TC/T3/TD-IV/2026-27 dt:29.05.2026 |
| Department | Hyderabad Metropolitan Water Supply and Sewerage Board |
| Tender Type | OPEN โ NCB |
| Tender Category | Works |
| Estimated Contract Value | โน9,95,46,442/- |
| Bid Submission Closing Date | 02.06.2026 โ 04:00 PM |
| Evaluation Type | Percentage |
๐ง Scope of Work
The project mainly includes:
- Shifting of existing 1800mm dia MS transmission main
- Manufacturing and supply of 1800mm dia MS pipes
- Trench excavation in soil and hard rock
- Trenchless pipe jacking works under railway crossing
- Lowering, laying and jointing of MS pipelines
- Hydrostatic pressure testing and commissioning
- Construction of thrust blocks
- Installation of DI air valves and gate valves
- Fabrication of bends, tees and manifold assemblies
- Gravel filling and trench restoration
- Dewatering operations
- Barricading and traffic safety measures
- Welding and junction works with existing transmission mains

๐ Major BOQ Components
| Component | Amount (โน) |
|---|---|
| Manufacture & Supply of 1800mm Dia MS Pipes | 6,49,22,100 |
| Manufacture & Supply of 2200mm Dia MS Pipe for Tunneling | 80,85,000 |
| Excavation in Hard Rock | 78,41,862 |
| Laying, Jointing & Hydrostatic Testing | 38,65,450 |
| Trenchless Pipe Jacking Works | 34,19,640 |
| RCC M20 Thrust Block Works | 20,40,412 |
| Earthwork Excavation | 19,76,381 |
| Manufacture of 1800mm Dia MS Bends | 19,50,735 |
| Carting Surplus Excavated Material | 11,31,599 |
๐ฐ BOQ Cost Summary
| Major Component | Approx. Value |
|---|---|
| 1800mm MS Transmission Pipes | โน6.49 Crores |
| Tunneling & Trenchless Crossing | โน1.15 Crores |
| Excavation (Soil + Hard Rock) | โน0.98 Crores |
| Pipeline Laying & Testing | โน0.39 Crores |
| Structural RCC & Thrust Blocks | โน0.20 Crores |
| Valves, Specials & Air Valve System | โน0.13 Crores |
๐ต Total Tender Value
โ Total Estimated Contract Value: โน9,95,46,442/-
This is one of the major transmission pipeline infrastructure projects involving large-diameter bulk water conveyance systems under the HMWSSB network.
โ๏ธ Major Machinery Required
The contractor may require:
- Heavy-duty Excavators
- Rock Breakers / Hydraulic Hammers
- Crane Equipment
- Side Boom Pipe Layers
- Welding Generators
- Pipe Alignment Equipment
- Trenchless Pipe Jacking Equipment
- Dewatering Pump Sets
- Tippers and Dumpers
- Gas Cutting Sets
- Hydrostatic Testing Equipment
- Concrete Mixers and Vibrators

๐ ๏ธ Technical Highlights
Key Features of the Work
- 1800mm dia MS Water Transmission Main
- 2200mm dia MS Casing Pipe for Tunneling
- Trenchless Railway Crossing Technology
- Large Diameter Pipeline Relocation
- Heavy-Duty Three-Line Arc Welding
- Hydrostatic Pressure Testing
- RCC Thrust Block Construction
- Air Valve and Sluice Valve Installations
- Hard Rock Excavation in Urban Areas
- Bulk Water Supply Infrastructure Protection
๐ Project Importance
This strategic transmission infrastructure project is expected to:
- Facilitate construction of the Railway Over Bridge at LC 246A
- Protect critical bulk water transmission assets
- Ensure uninterrupted drinking water supply
- Improve long-term reliability of the transmission network
- Strengthen regional water distribution infrastructure
- Reduce future maintenance and operational risks
๐ Excavation, Pipeline & Infrastructure Contractor Services
For similar works including:
- MS Water Transmission Pipelines
- DI & MS Pipeline Laying
- Trenchless Pipe Jacking Works
- Hard Rock Excavation
- JCB Excavation Services
- Rock Breaking Works
- Valve Chamber Construction
- Bulk Water Supply Infrastructure
- Sewer and Water Pipeline Projects
- Building Demolition Services