hyderabadtenders.online HMWSSB Replacement of 100mm Dia RCC Line from 17-1-197/C/T to 17-1-197/7/10/F, Compound Gally Dhobi Ghat Area under Madannapet Section, SD-II of O&M Division No. II (New Division No. XII)

Replacement of 100mm Dia RCC Line from 17-1-197/C/T to 17-1-197/7/10/F, Compound Gally Dhobi Ghat Area under Madannapet Section, SD-II of O&M Division No. II (New Division No. XII)

Category: HMWSSB / Water Supply Pipeline Works

📌 Tender Overview

The Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB) has invited open tenders for replacement of an existing 100mm dia RCC water supply line from 17-1-197/C/T to 17-1-197/7/10/F in Compound Gally Dhobi Ghat area under Madannapet Section, SD-II of Operations and Maintenance Division No. II (New Division No. XII).

The project includes RCC pipeline replacement, DI K7 pipe laying, road cutting, excavation, quarry dust filling, barricading, PCC works, PPC connection replacement, and allied civil infrastructure works for improving water supply distribution in the locality.

📄 Basic Tender Details

ParticularsDetails
Tender ID704318
Tender Notice No.EP-02/CGM(E)/CZ-VI/Div-XII/2026-27, Dt:27.05.2026
DepartmentHMWSSB
Tender TypeOPEN – NCB
Tender CategoryWorks
Estimated Contract Value₹3,43,899/-
Bid Submission Closing Date02.06.2026 – 05:30 PM
Evaluation TypePercentage

🚧 Scope of Work

The project mainly includes:

  • Replacement of damaged RCC water supply pipeline
  • Laying of 100mm dia DI K7 pipes
  • Earthwork excavation for pipeline trenches
  • Quarry dust filling in trenches
  • PCC concrete works
  • Replacement of damaged MDPE PPC house connections
  • Barricading and traffic safety arrangements
  • Cutting of CC roads for pipeline trenches
  • Lowering and jointing of DI pipes
  • Valve fixing and testing works
  • Manhole chamber installation

The work is intended to strengthen the water supply network and improve pipeline reliability in the Dhobi Ghat area under Madannapet Section.

📊 Detailed BOQ (Bill of Quantities)

Sl. NoDescriptionQtyUnitRate (₹)Amount (₹)
1Conveyance of DI K7 pipes from stores to work site2.03MT1,737.503,527.12
2Plain Cement Concrete (1:2:4) works17.82Cum6,233.541,11,081.68
3Supply & filling of quarry dust11.88Cum665.507,906.14
4Carting away surplus excavated material27.95Cum192.145,370.31
5Supply & laying of 100mm dia SWG pipes14.40Rmt312.404,498.56
6Replacement of damaged MDPE PPC household connections60.00Each263.7015,822.00
7Supply & fixing of precast RCC manhole chamber1.00Each6,810.106,810.10
8Jointing of D/F pipes, specials & valves2.00Each348.30696.60
9Labour charges for lowering DI/CI sluice valves1.00Each270.90270.90
10Jointing of DI K7 pipes with Tyton rubber joints28.00Each186.605,224.80
11Lowering and laying of DI K7 pipes132.00Rmt68.008,976.00
12Cutting DI pipes without water in mains2.00Each155.50311.00
13Barricading, boarding, lighting & watching works132.00Rmt245.1032,353.20
14Earthwork excavation for pipeline trenches109.35Cum523.7057,266.60
15Cutting of CC roads including WBM for pipeline trenches27.94Cum2,998.7083,783.68
Total BOQ Amount₹3,43,899/-

💰 BOQ Cost Summary

Major ComponentAmount
PCC Concrete Works₹1.11 Lakhs
Road Cutting Works₹0.84 Lakhs
Earthwork Excavation₹0.57 Lakhs
Barricading & Safety Arrangements₹0.32 Lakhs
PPC Connection Replacement₹0.16 Lakhs
Quarry Dust Filling & Miscellaneous Works₹0.14 Lakhs

💵 Total Tender Value

Total Estimated Contract Value: ₹3,43,899/-

The BOQ total matches the official HMWSSB tender estimate published in the Telangana eProcurement portal.

⚙️ Major Machinery Required

The contractor may require:

  • Excavators / JCBs
  • Road cutting machines
  • Concrete mixers
  • Pipe lowering equipment
  • Tippers
  • Water tankers
  • Barricading equipment
  • Hand compaction tools

🛠️ Technical Highlights

Key Features of the Work:

  • 100mm dia RCC pipeline replacement
  • DI K7 water supply pipe laying
  • Tyton rubber joint technology
  • PCC bedding and support works
  • Urban road cutting and restoration
  • Quarry dust trench filling
  • Household PPC connection restoration
  • Traffic diversion and barricading works

📍 Project Importance

This water supply infrastructure project is expected to:

  • Improve water supply distribution efficiency
  • Reduce pipeline leakages and damages
  • Strengthen underground water infrastructure
  • Improve water flow reliability for residents
  • Support better urban utility management

📞 Excavation & Pipeline Contractor Services

For similar works including:

  • Water supply pipeline laying
  • DI K7 pipeline works
  • RCC pipeline replacement
  • Road cutting works
  • Excavation works
  • JCB excavation
  • Barricading works
  • Building demolition services

Contact:
Mobile: 9440969690

Websites:
JCB On Hire Hyderabad https://jcbonhire.com/
Building Demolition Contractor https://l1nk.dev/u69n685

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post